Friday, November 4, 2016

Shop Drawing Stamps

StampShopCentral.com

Variables of a Shop Drawing Stamp

Shop Drawing Submittal Review Stamp

Engineer, Architect &
General Contractor stamps

The Construction Industry holds many legal opinions regarding the proper shop drawing stamp language. Liability emerges from the shop drawing approval process. Shop Drawing procedures vary, as well as the stamp language used. We have several options to choose from to accommodate your preferences.

 The most commonly used Shop Drawing/Submittal Review stamp is: 
This Option 1 Shop Drawing stamp comes with standard check boxes
and paragraph verbiage :
            • Approved
            • Approve with Changes Noted
            • Revise and Resubmit
            • Rejected
SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITY AND 
GENERAL CONFORMANCE TO CONTRACT DOCUMENTS
ONLY. THE CONTRACTOR IS RESPONSIBLE FOR 
CONFIRMING AND CORRELATING DIMENSIONS AT JOBSITE 
FOR TOLERANCE, CLEARANCE, QUANTITIES, FABRICATION
PROCESSES AND TECHNIQUES OF CONSTRUCTION,
COORDINATION OF HIS WORK WITH OTHER TRADES AND
FULL COMPLIANCE WITH CONTRACT DOCUMENTS.
______________________________________________________________________
In Option 2 the check boxes are different:


            • Reviewed
            • Reviewed with Changes Noted
            • Revise and Resubmit
            • Rejected
The verbiage in the paragraph is the same as in Option 1, 2 & 4.