Variables of a Shop Drawing Stamp

Shop Drawing Submittal Review Stamp

Engineer, Architect &
General Contractor stamps

The Construction Industry holds many legal opinions regarding the proper shop drawing stamp language. Liability emerges from the shop drawing approval process. Shop Drawing procedures vary, as well as the stamp language used. We have several options to choose from to accommodate your preferences.

 The most commonly used Shop Drawing/Submittal Review stamp is: 
This Option 1 Shop Drawing stamp comes with standard check boxes
and paragraph verbiage :
            • Approved
            • Approve with Changes Noted
            • Revise and Resubmit
            • Rejected
SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITY AND 
GENERAL CONFORMANCE TO CONTRACT DOCUMENTS
ONLY. THE CONTRACTOR IS RESPONSIBLE FOR 
CONFIRMING AND CORRELATING DIMENSIONS AT JOBSITE 
FOR TOLERANCE, CLEARANCE, QUANTITIES, FABRICATION
PROCESSES AND TECHNIQUES OF CONSTRUCTION,
COORDINATION OF HIS WORK WITH OTHER TRADES AND
FULL COMPLIANCE WITH CONTRACT DOCUMENTS.
______________________________________________________________________
In Option 2 the check boxes are different:


            • Reviewed
            • Reviewed with Changes Noted
            • Revise and Resubmit
            • Rejected
The verbiage in the paragraph is the same as in Option 1, 2 & 4.
_______________________________________________________________________

 Option 3 has the same check boxes as Option 1
but the paragraph verbiage is changed in that 'SUBCONTRACTOR' replaces 'CONTRACTOR'

            • Approved
            • Approve with Changes Noted
            • Revise and Resubmit
            • Rejected
_______________________________________________________________________

Option 4 the variation is again in the check boxes,
leaving the paragraph verbiage the same as in Option 1, 2 & 4.

            • Approved
            • Approve as Noted
            • Revise and Resubmit
            • Rejected
__________________________________________________________________

And finally, Option 5, variation is in the check boxes.
Paragraph verbiage is the same as Option 1, 2 &4.

            • No Exceptions Taken
            • Make Corrections Noted
            • Revise and Resubmit
            • Rejected
According to many sources,  Professionals' Liability Insurance does not allow for marking Shop Drawings as 'Approved'.  As such, we provide a Shop Drawing Submittal Review stamp here with our Option 5 stamp that better aligns with that theology, via the check boxes of this stamp.
_______________________________________________________________________

These are by no means the be all, end all of a shop drawing or submittal stamp.
These are the most common ones that we have provided to customers. Variations in verbiage, format and size are endless. View our web store under Construction Stamps for additional options. If you don't see what you are looking for please call or email us with what you would like to see on your Shop Drawing or Submittal Review stamp. We will work up an image for your review. We know getting a stamp is not your top priority but is a necessity of the industry.
We make every attempt to make it a effortless process for you.
__________________________________________________________________________

Give us your feedback on our article and any additional stamps you would like to see offered.

 

 